|
|
|
FUYONG CAMPUS
230,000 sq. ft. factory in Fuyong, 2 miles from Shenzhen international airport, offers the latest manufacturing technology in an excellent logistical location. |
|
|
|
FUYONG CAMPUS
As seen from overhead, the campus has all the facilities critical for power supply manufacturing, including surface mount (SMT), auto insertion, through-hole assembly, in-circut testing (ICT), transformer assembly, auto testing (ATE), and burn-in. Support facilities include warehousing, dormitories, and back-up power generation. |
|
|
|
FUYONG CAMPUS
Document Control
Localized document control is associated with each facility. |
|
|
|
FUYONG CAMPUS
Training
Training classes associted with ISO9000 processes are held regulary |
|
|
|
FUYONG CAMPUS
Through-hole assembly
Through-hole assembly lines, essential to the manufacturing of power supplies, are well designed and supported with engineering controlled process drawings. |
|
|
|
|
FUYONG CAMPUS
Through-hole assembly
Each campus supports processes specific to product and customer needs, providing Fortron/Source the unique ability to manufacture a wide variety of products, ranging from high volume wall adaptors to multiple kilowatt power systems. |
|
|
|
FUYONG CAMPUS
Surface mount assembly
Multiple medium speed surface mount lines support all of the factory requirements. They have the capability of both standard and fine pitch. The reflow ovens are fully ROHS compatible. |
|
|
|
FUYONG FACTORY
Magnetic assembly
Magnetic assemblies, crucial components in all power supply designs are producted and controlled in the Fortron/Source or associated factories. Over 7 million components are produced per month. |
|
|
|
FUYONG CAMPUS
Test
Long time established computer controlled testing (ATE) assures repeatable results. Data logging provides a means of establishing SPC over the process. |
|
|
|
FUYONG CAMPUS
Test
Multiple testers are geared toward the prodcuts being manufactured. |
|
|
|
|
FUYONG CAMPUS
Burn-in
Controlled burn-in ovens are installed in all manufacturing facilities. |
|
|
|
|
FUYONG CAMPUS
Inspection
Multiple inspection points provide instantaneous feedback to the process. |
|
|
|
|
FUYONG CAMPUS
Final inspection and packaging. |
|
|